Information about the New Exhibition Hall

New Exhibition Hall
Responsible Construction

We are building the New Exhibition Hall at the Prague Congress Centre – one of the most significant development projects in the history of our venue. The new building will expand the Centre's capacity to host international congresses, conferences, exhibitions, cultural and social events while seamlessly integrating with the existing facilities.

The Hall will offer 5 000 m2 of net exhibition space, which can be flexibly divided into up to five independent sections. Upon completion, the Prague Congress Centre's total exhibition space will exceed 21 000 m2.

The New Exhibition Hall project originated from an international open architectural and urban design competition, which attracted 70 proposals. The winning design, created by the Spanish studio OCA Architects, impressed the jury with its architectural quality, sensitive integration into the Prague Congress Centre complex and strong emphasis on high-quality public space.

The project was also refined based on public feedback collected during a public consultation organised by the Prague Institute of Planning and Development (IPR Prague).

Construction is taking place while the Prague Congress Centre remains fully operational. Our goal is to minimise the impact of the construction works on visitors, local residents, transport and the environment. On this page, we regularly publish updates on construction progress, planned works and any temporary restrictions. We apologise for any inconvenience these may cause and appreciate your understanding.

Benefits of the New Exhibition Hall
An Investment in Prague's Future
The New Exhibition Hall represents a long-term investment that will benefit not only the Prague Congress Centre but also the City of Prague and its residents. It will strengthen Prague's position on the international meetings market, support tourism, create high-quality public spaces and contribute to the continued development of the entire area.


For Prague
• Ability to host larger international congresses, conferences and exhibitions
• More international visitors and increased economic benefits for hotels, restaurants, transport providers and other local businesses
• A stronger position for Prague among Europe's leading congress destinations

For Visitors
• New, modern facilities for congresses, exhibitions, cultural and social events
• Improved visitor comfort and overall event experience
• Better connectivity between different parts of the Prague Congress Centre

For the Local Area
• Revitalisation of surrounding outdoor areas and public spaces
• Clearer pedestrian routes and safer movement around the venue
• A more attractive and welcoming environment for visitors and local residents
• Redevelopment of Pankrác Square, including new landscaping and public amenities

For the Prague Congress Centre
• Expansion of total exhibition space to more than 21 000 m2
• Capacity to host events for up to 13 000 participants
• Long-term development of the venue and increased competitiveness within the European meetings market

Information for Visitors and Local Residents
Construction Site and Surroundings
Alongside the construction of the New Exhibition Hall, the South Parking Garage is also being completely renovated. The garage will provide approximately 520 parking spaces upon completion.

The modernisation of the parking facilities is being coordinated with the construction of the New Exhibition Hall and, together with the revitalisation of Pankrác Square, forms part of the comprehensive redevelopment of the entire Prague Congress Centre complex.
Barevna primarni varianta

Pedestrian route around the construction site

Download

Surface parking

Download

protokol

Secure underground parking & coach parking

Download

Information for Visitors and Local Residents
Photo Gallery & Time-lapse

Visualisations of the New Exhibition Hall

nova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizacenova-hala-vizualizace

Construction Photo Gallery – July 2026 - coming soon

Time-lapse Video - coming soon

FAQ
Frequently Asked Questions

Yes. The Prague Congress Centre will remain fully operational throughout the construction of the New Exhibition Hall. All scheduled congresses, conferences, cultural events and social functions will take place as planned. The construction works are carefully managed to minimise any impact on visitors, event organisers and the overall event experience.

Due to the construction of the New Exhibition Hall and the ongoing South Garage revitalisation, parking capacity at the Prague Congress Centre is temporarily reduced. In addition, the P+R car park has been closed since 7 May 2026.

Current parking availability and any traffic restrictions are shown on the site map. We also recommend using public transport – Vyšehrad metro station (Line C) is located directly next to the Prague Congress Centre.
Underground parking and Coach

Access to the Holiday Inn Prague is maintained throughout the construction period. Due to the ongoing works, a recommended pedestrian route may be in place. Please follow the route shown on the site map and the directional signage throughout the Prague Congress Centre campus.
Parking between the Holiday Inn Prague and the Prague Congress Centre

The construction is expected to take approximately 27 months. Completion of the project is scheduled for the third to fourth quarter of 2028.

Current pedestrian and vehicle diversion routes around the construction site are shown on the site map available on this page.

We regularly update the progress of the New Exhibition Hall to keep you informed about the most important construction activities and upcoming project milestones.

Below you will find the construction schedule for the upcoming period. Please note that the dates provided are indicative only and may change depending on the progress of the construction works

The general contractor for the Prague Congress Centre's New Exhibition Hall is GEMO a.s., one of the Czech Republic's leading construction companies with extensive experience in delivering major public, commercial and industrial projects.
For more information about the company, please visit www.gemo.cz.

Yes. If you have any questions, please contact us using the contact form. Our team will respond as soon as possible.

The construction of the New Exhibition Hall represents an investment of approximately CZK 1.35 billion. The majority of the project costs, around CZK 1.2 billion, are financed by the Prague Congress Centre from its own resources. The City of Prague, as the company's sole shareholder, is contributing CZK 150 million towards the construction.

INFORMATION FOR VISITORS AND LOCAL RESIDENTS
Construction Timeline

2026

1. PHASE

Project Foundations

  • Site preparation
  • Pile foundation works
  • Construction of the foundation structures
  • Basement levels and technical facilities

2027

2. PHASE

Structural Construction

  • Reinforced concrete structure
  • Installation of the steel structure
  • Roof structure
  • Façade and building envelope

2028

3. PHASE

Project Completion

  • Internal installations and building services
  • Interior fit-out
  • Connection to the existing Prague Congress Centre building
  • Commissioning
Q3-Q4
2028
Planned Opening
Opening of the New Exhibition Hall

Following the completion of the construction works, the project will enter the commissioning phase, followed by final approval and the opening of the New Exhibition Hall at the Prague Congress Centre.

Construction by the Numbers
 

7 000 m3 of concrete

Equivalent to approximately 1 000 concrete mixer trucks

 

1 600 tonnes of structural steel

Approximately 70 truckloads of steel will be required for the construction

 

1 000 tonnes of reinforcing steel

Equivalent to approximately 50 truckloads of reinforcing steel

 

900 metres of bored piles

Providing the deep foundations for the New Exhibition Hall

 

16 000 m2 of façade cladding

An area equivalent to more than two football pitches

 

6 new lifts

Including 2 heavy-duty lifts with a 6-tonne capacity

 

4 new escalators

Providing more convenient visitor circulation between the different levels

 

Nearly 20 000 temporary support props

Used during construction to temporarily support the reinforced concrete structure

© Prague Congress Centre